Choose a state
UCWA Unlimited Commercial Wiring (2012-05-01)
100 Questions, Minimum 70% Required to Pass, Time Allowed 120 Minutes
These products apply to test outline dated 2012-05-01
Open Book These books are allowed while taking your test.
Closed Book These books are for pre-test study only and are not available for use during the test.
In Stock These books are currently in stock.
Out of Stock These books are currently out of stock.
Closed Book These books are for pre-test study only and are not available for use during the test.
In Stock These books are currently in stock.
Out of Stock These books are currently out of stock.
-
Open Book Out of Stock
NFPA 72: National Fire Alarm and Signaling Code
Publication Year: 2010
$95.11
1.1 Scope. 1.1.1 NFPA 72 covers the application, installation, location, performance, inspection, testing, and maintenance of fire alarm systems, supervising station alarm systems, public emergency alarm reporting systems, fire warning equipment and emergency communications systems (ECS), and their components. 1.1.2 The provisions of this chapter apply throughout the Code unless otherwise noted -
Open Book Out of Stock
Alaska Electrical Administrator Statutes and Regulations
$9.15
AS 08.40; 12 AAC 32
-
-
Open Book Out of Stock
Alaska Construction Contractor Statutes and Regulations
$9.15
AS 08.18; 12 AAC 21